● Overview
The Alloy Reno Mattresses are low-profile, large-area cage structures made from high-strength alloy-coated wires and designed for stone filling on-site. Engineered for river channels, bank slopes and roadbed protection, they provide erosion control while maintaining natural water–soil exchange for ecological balance. As a trusted China Alloy Reno Mattresses Factory and Suppliers, we offer durable solutions that support vegetation growth and long-term slope reinforcement.
● Features
1. High Performance Alloy Wire: Enhanced corrosion resistance and durability, ideal for long-term Alloy Reno Mattresses Application in demanding hydrological environments.
2. Low-Height, Wide-Panel Design: The flat structure distributes load evenly, prevents stone displacement, and strengthens slope stability.
3. Flexible Double-Twisted Mesh: Adapts to uneven ground and foundation settlement without structural failure.
4. Ecological Compatibility: Supports vegetation and allows natural water circulation to maintain eco-balance on protected slopes.
5. Fast Assembly: Prefabricated units, easy folding, and secure wire binding reduce installation time and labor.
● Applications
1. River bank protection:Prevents erosion, wave impact and stone collapse on river channels and embankments.
2. Coastal defense:Alloy materials ensure superior corrosion resistance in marine environments.
3. Slope stabilization:Suitable for gentle and steep slopes in roadbeds, canals and engineered terrain.
4. Landscape engineering:Enables green slope design with vegetation cover and natural aesthetics.
5. Infrastructure reinforcement:Used in drainage channels, bridges, dams and water-control projects.
● Installation & Maintenance
Installation:
1. Transport pre-assembled, compressed mattresses from the factory.
2. Unfold units on flat ground and shape the panels and partitions.
3. Connect corners and edges using double-strand binding wires or ring fasteners.
4. Position empty mattresses, interconnect sections, and fill with stones.
5. Close and secure mesh covers to complete the installation.
Maintenance:
1. In coastal or high-moisture areas, choose alloy-coated or PVC-coated wires for extended service life.
2. Inspect wire bindings and exposed edges periodically after flooding or seasonal changes.
3. Encourage vegetation growth for added slope protection and long-term structural stability.
● Manufacturing Process
Our China Alloy Reno Mattresses Factory and Suppliers follow a strict production workflow:
Wire rod → Cold drawing → Alloy galvanizing / PVC coating → Machine weaving → Manual shearing & assembly → Inspection → Packaging & transport.
This ensures uniform tensile strength, coating thickness and unmatched durability for all Alloy Reno Mattresses Application scenarios.
● Conclusion
The Alloy Reno Mattresses provide long-lasting erosion control, excellent corrosion resistance and strong adaptability to varied terrain.Designed for riverbanks,coasts and engineered slopes, they offer stable performance, eco-friendly characteristics and reliable protection suitable for large-scale infrastructure projects.
● FAQ
Q1. Are Alloy Reno Mattresses suitable for steep slope protection?
A2:Yes. The flexible double-twisted mesh adapts to steep slopes. Hardwood wedges or additional anchors can be added based on engineering requirements.
Q2. How are the mattresses delivered and assembled on-site?
A3:Products are pre-folded and compressed for transport. On-site, they are unfolded, shaped, wired together, filled with stones, and secured with mesh covers.
● Preparation before construction
1. Carefully read the construction drawings of Renault pads to understand the design intentions and construction requirements.
2. Conduct a survey of the construction site to confirm key information such as geological conditions, water levels, and water flow speeds, and assess construction difficulty and risks.
3. Develop detailed construction plans and safety measures, and conduct technical briefings and safety training.
4. Prepare the required construction machinery, tools and materials to ensure that the equipment is in good condition and in sufficient quantity.
● Material inspection and calculation
1. Conduct quality inspection on Renault pads, including mesh specifications, thickness, tensile strength, etc., to ensure compliance with design requirements.
2. Based on the construction drawings and actual site conditions, calculate the quantity, specification and size of the required Reno pads to ensure sufficient material preparation.
● Pad assembly and fixation
1. According to the requirements of the design drawing, assemble the mesh of the Renault pad into the required shape and size.
2. During the assembly process, pay attention to that the connection between the mesh panels should be firm and reliable to avoid looseness or misalignment.
3. Fix the assembled protective pad at the preset position, and you can use steel bars, wooden piles and other fixing objects for reinforcement.
● Stone filling and cover installation
1. Fill the inside of the pad with an appropriate amount of stones, and note that the particle size and gradation of the stones should meet the design requirements.
2. During the stone filling process, the stones should be distributed evenly and tightly to avoid cavities or looseness.
3. After the stone filling is completed, install the cover plate of the protective pad to ensure that the cover plate and the protective pad fit tightly and seamlessly.
● Pad laying and connection
1. According to the requirements of the construction drawings, lay the Renault pads in sequence to ensure that the connections between the pads are tight and smooth.
2. At the connection, methods such as binding and stitching can be used to strengthen the connection strength to prevent the pad from being displaced or damaged when brushed by the water flow.
● Backfilling and compaction
1. After the protective mat is laid, perform backfilling with soil.The soil material should be clay soil or sandy soil that meets the requirements.
2. During the backfilling process, backfilling should be carried out in layers and compacted layer by layer to ensure the compactness and stability of the backfill soil.
● Quality inspection and acceptance
1. Conduct quality inspection on the completed Renault pads, including the size, flatness, connection strength, etc. of the pads.
2. If there are any unqualified items, they should be rectified and repaired in time until the design requirements are met.
3. After passing the quality inspection, organize relevant departments to conduct acceptance inspection to ensure that the construction quality meets the specification requirements.
● Later maintenance and upkeep
1. Regularly inspect and monitor Renault pads, paying attention to key indicators such as the integrity, connection strength and stability of the pads:
2. If the pad is found to be damaged, displaced or loose, it should be repaired and reinforced in time to ensure the protective effect.
3. In areas where the water level changes greatly or the water flow is strong, inspection and maintenance frequency should be strengthened to ensure the safe and stable operation of the pad.
To sum up, the installation, construction and maintenance of Renault pads involve many aspects, which require construction units and technical personnel to operate and manage in strict accordance with specifications and requirements to ensure construction quality and protective effects.
|
|
|
|
|
|